Here's some of the work we've been doing over the last three weeks to prepare for 40 staff moving into the 9000 sq. ft. of office space we leased to replace our 13 year-old temporary building.
In the process of installing data and phone cables:
Ian and Jeremy begin installing equipment in the phone/network room:
Jerry and Kevin from WKT (our phone vendor) installing the phone system:
Ian installing a repurposed Dell 2650 for use as a file/print server (it does DFS replication with a server in our data center on Central Campus):
April 14, 2007